Bathroom Remodel

Budget Bathroom Remodel

A full bathroom refresh in the same layout, for about $10,000 all-in.

Before: Budget bathroom remodel — old fiberglass tub-shower replaced with a new tub and surround, same layout
After: Budget bathroom remodel — old fiberglass tub-shower replaced with a new tub and surround, same layout
BeforeAfter
⇆ Drag to compare
The project

What about $10,000 bought.

The homeowners wanted a bathroom that looked and worked like new without paying for a custom remodel. The layout stayed exactly as it was, and that is where the savings start: no plumbing or electrical moved, no walls changed.

Everything else came out: the old one-piece fiberglass tub-shower, the vanity, the toilet and the flooring. The subfloor at the tub was water-stained, so a small section was repaired before anything new went in. Then a new tub and surround, drywall patching and texture, Sherwin-Williams paint, new underlayment and sheet vinyl flooring, and a new vanity with a solid-surface top, faucet, mirror and toilet.

All-in, labor and materials, it came to about $10,000 in 2020. With budget materials we can still do the same scope for about that today. Most homeowners choose a few upgrades, like a new shower valve or nicer cabinets, which usually puts a bathroom like this at $12,000–$14,000.

17 photos · start to finish

Nine days, same layout.

Before: the original tub and fiberglass surround.
Before: the original tub and fiberglass surround.
Before: the original tub-shower, full height.
Before: the original tub-shower, full height.
Tub alcove opened to the studs.
Tub alcove opened to the studs.
Tub wall stripped; drain and vent lines exposed.
Tub wall stripped; drain and vent lines exposed.
Water staining on the subfloor at the tub alcove.
Water staining on the subfloor at the tub alcove.
Supply and drain lines in the open wall.
Supply and drain lines in the open wall.
Vanity wall after demo: old vanity and toilet out.
Vanity wall after demo: old vanity and toilet out.
New tub and surround set in the alcove.
New tub and surround set in the alcove.
New tub leveled; surround panels in place.
New tub leveled; surround panels in place.
Drywall patched around the new surround.
Drywall patched around the new surround.
New underlayment down; fan drying the patches.
New underlayment down; fan drying the patches.
Walls painted, surround unmasked.
Walls painted, surround unmasked.
New sheet vinyl flooring down.
New sheet vinyl flooring down.
New vanity, top, faucet, mirror and toilet.
New vanity, top, faucet, mirror and toilet.
New vanity top over the new floor.
New vanity top over the new floor.
New vanity and toilet, same layout as before.
New vanity and toilet, same layout as before.
Finished tub-shower from the doorway.
Finished tub-shower from the doorway.