Home/Work/E 26th Whole Home Renovation
Whole-Home Renovation

E 26th Whole Home Renovation

A full exterior and interior renovation, from dry rot and a new roof to a new kitchen and baths.

Before: E 26th Whole Home Renovation: before and after
After: E 26th Whole Home Renovation: before and after
BeforeAfter
⇆ Drag to compare
The project

Every part of the house.

This Rose Village home got a full exterior and interior renovation, and the work touched nearly every part of the house.

Outside: the dry rot was fixed, a new roof went on, the siding was repaired and the exterior was repainted with Sherwin-Williams. Then came landscaping and new fencing.

Inside: the kitchen was remodeled with new cabinets, counters and appliances under a new skylight. The bathrooms were fully remodeled with new vanities and tiled showers, and new flooring went in throughout.

Photos

The job, photo by photo.

Before: The house before the remodel — original siding and roof, overgrown yard.
The house before the remodel — original siding and roof, overgrown yard.
Install: Kitchen cabinets going in; the ceiling opened up for the new skylight.
Kitchen cabinets going in; the ceiling opened up for the new skylight.
Install: Kitchen install under way — cabinets set, counters and island still to come.
Kitchen install under way — cabinets set, counters and island still to come.
Install: Skylight in overhead; island base set and cabinets wrapping the room.
Skylight in overhead; island base set and cabinets wrapping the room.
Install: The sink-wall run — cabinets in, counters still to come.
The sink-wall run — cabinets in, counters still to come.
Install: New siding on the back elevation; the old deck platform still below.
New siding on the back elevation; the old deck platform still below.
Paint: Front elevation repainted with the new roof on; yard work still ahead.
Front elevation repainted with the new roof on; yard work still ahead.
Install: The kitchen's range wall — hood and microwave in, counters set.
The kitchen's range wall — hood and microwave in, counters set.
Install: Appliance install day — fridge unwrapped, dishwasher going in.
Appliance install day — fridge unwrapped, dishwasher going in.
Install: Appliances landing — range still in its protective film.
Appliances landing — range still in its protective film.
Done: Front exterior at dusk — paint and roof done, drive still gravel.
Front exterior at dusk — paint and roof done, drive still gravel.
Done: Front exterior — gravel drive in and landscaping under way.
Front exterior — gravel drive in and landscaping under way.
Done: The finished kitchen under its skylight.
The finished kitchen under its skylight.
Done: Side elevation finished — new fence and lawn in.
Side elevation finished — new fence and lawn in.
Done: Side elevation, second take.
Side elevation, second take.
Done: Finished kitchen, vertical — listing screenshot with a realtor watermark.
Finished kitchen, vertical — listing screenshot with a realtor watermark.
Done: Finished kitchen, second vertical — listing screenshot with a realtor watermark.
Finished kitchen, second vertical — listing screenshot with a realtor watermark.
Done: Main bathroom — new double vanity and flooring.
Main bathroom — new double vanity and flooring.
Done: Finished kitchen wide (listing photo).
Finished kitchen wide (listing photo).
Done: Second bathroom — new vanity with the tiled shower.
Second bathroom — new vanity with the tiled shower.
Done: New tiled shower with rainfall head.
New tiled shower with rainfall head.
Done: Main bathroom vanity, second angle.
Main bathroom vanity, second angle.
Done: Side elevation with the new fence (listing photo).
Side elevation with the new fence (listing photo).
Done: Side elevation and lawn, wider take.
Side elevation and lawn, wider take.
Done: Front yard finished — new lawn and fence.
Front yard finished — new lawn and fence.
Done: Front elevation and drive, finished.
Front elevation and drive, finished.
Done: The finished front — new walkway, lawn, and paint.
The finished front — new walkway, lawn, and paint.
Ready when you are

Planning something like this?

Free onsite consultation and a line-item estimate you can actually read — usually same day to 48 hours, depending on scope.