The project

Out with the old kitchen.

The old kitchen came out completely: the white cabinets, the island, the counters and the flooring. With the back wall stripped and the floor up, the kitchen and the living area beside it became one open work area.

The new kitchen went in with dark cabinets, new counters and stainless appliances, and new plank flooring now runs from the kitchen through the adjoining living area. The first and last photos are taken from the same spot.

Kitchen · Vancouver, WA

The old kitchen out, a new one in, and new plank flooring through the kitchen and living area.

Day by day

Photo by photo.

  1. Day
    01
    Oct 11
    Before: The old kitchen before demo — white cabinets, island, wood floors.
    Before. The old kitchen before demo — white cabinets, island, wood floors.
    Demo: Cabinets coming out — the back wall opened up and the backsplash stripped.
    Demo. Cabinets coming out — the back wall opened up and the backsplash stripped.
    Demo: Back wall stripped and flooring coming up.
    Demo. Back wall stripped and flooring coming up.
    Demo: Old flooring and demo debris piled in the living area.
    Demo. Old flooring and demo debris piled in the living area.
    Demo: The opened-up kitchen and living area mid-demo.
    Demo. The opened-up kitchen and living area mid-demo.
  2. Day
    02
    Nov 2
    Install: New dark cabinets in and the new floor down — island still being set.
    Install. New dark cabinets in and the new floor down — island still being set.
  3. Day
    03
    Nov 9
    Done: The new kitchen nearly complete — stainless fridge in, range still taped.
    Done. The new kitchen nearly complete — stainless fridge in, range still taped.
    Floor: Toe-kick and new plank flooring detail.
    Floor. Toe-kick and new plank flooring detail.
    Floor: New flooring flowing from the kitchen into the living area.
    Floor. New flooring flowing from the kitchen into the living area.
  4. Day
    04
    Nov 13
    Done: Finished kitchen from the before angle.
    Done. Finished kitchen from the before angle.
    Done: Kitchen and the adjoining room with its new floor.
    Done. Kitchen and the adjoining room with its new floor.
    Floor: The adjoining room's new plank floor, empty and finished.
    Floor. The adjoining room's new plank floor, empty and finished.
    Done: The finished counter run — sink, dishwasher, range.
    Done. The finished counter run — sink, dishwasher, range.
Finished

The finished job.

Done: The new kitchen nearly complete — stainless fridge in, range still taped.
The new kitchen nearly complete — stainless fridge in, range still taped.
Done: Finished kitchen from the before angle.
Finished kitchen from the before angle.
Done: Kitchen and the adjoining room with its new floor.
Kitchen and the adjoining room with its new floor.
Done: The finished counter run — sink, dishwasher, range.
The finished counter run — sink, dishwasher, range.