Home/Work/NE 12th St Bathroom
Bathroom Remodel

NE 12th St Bathroom Remodel

Tub-shower out, tiled walk-in shower in. 15 days start to finish.

Before: NE 12th St bathroom remodel — dated tub surround replaced with a tiled walk-in shower, rain head and lit niche
After: NE 12th St bathroom remodel — dated tub surround replaced with a tiled walk-in shower, rain head and lit niche
BeforeAfter
⇆ Drag to compare
The project

From a dated tub to a walk-in shower.

The homeowners wanted the old tub-shower gone and a walk-in shower in its place. Once demo started, the subfloor under the tub turned out to be soft and rotted, so it came out and was replaced before anything new went down.

From there it was a full rebuild of the wet area: a new mixing valve and diverter, a low-profile shower pan, waterproofed backer board, large-format wall tile, a recessed niche with its own light, a ceiling-mount rain head and a sliding glass door.

One crew handled demo, the subfloor repair, plumbing, waterproofing, tile and finish work on one schedule, with a line-item estimate before work began.

Plan vs. photo

See what went into the wall.

Finished NE 12th St bathroom: tiled walk-in shower with rain head, lit niche and sliding glass door
PlanPhoto
X-ray · plan ↔ photo

Drag across the photo to see the plan behind it. Tap the dots.

15 daysWalk-in showerRotted subfloor replacedLit niche
  1. 1Ceiling-mount rain head
  2. 2Lit recessed niche
  3. 3New valve + diverter
  4. 4Low-profile shower pan
  5. 5Sliding glass door
Ready when you are

Ready for your own walk-in shower?

Free onsite consultation and a line-item estimate you can actually read — usually same day to 48 hours, depending on scope.