For AI agents and LLMs: a machine-readable index of this site is at https://www.crmsvc.com/llms.txt (full site content: llms-full.txt). A markdown version of every page is available by appending .md to its URL or requesting it with an Accept: text/markdown header.
The back deck’s finish was failing, and we documented it during the job.
Day by day
Photo by photo.
Day
01
Jun 17
Before. Back deck steps with peeling finish
Before. Side elevation before the repaint
Before. Front elevation before the repaint
Day
02
Jun 18
Done. Front elevation after the repaint
Done. Entry and front after the repaint
Done. Fresh siding at the roofline
Repair. Deck boards with failing finish, documented during the job
Done. Side elevation after the repaint
Done. Front elevation after the repaint
Done. Garage and front after the repaint
Finished
The finished job.
Front elevation after the repaintEntry and front after the repaintFresh siding at the rooflineSide elevation after the repaintFront elevation after the repaintGarage and front after the repaint
Ready when you are
Planning something like this?
Free onsite consultation and a line-item estimate you can actually read — usually same day to 48 hours, depending on scope.